Dongguan Geli Tool Co.,Ltd 当前位置: 首页 >>News >>Technical information | ||||||||||||||||||||||||||||||||||||||||||||||||||
RJQ series of joint machine Manual | ||||||||||||||||||||||||||||||||||||||||||||||||||
RJQ series of joint machine Manual
This product is suitable for the plastic pipe of hot plasticity such as the connection of PP-R, PE, PP-C. There are the following series of products in our factory: (600W mixes BD-1 type Ø20Ø25Ø32Mould head) ; (800W mixes BD-2 type Ø20Ø25Ø32Ø40Ø50Ø63Mould head) ; (1200W mixes BD-3 type Ø75Ø90Ø110Mould head) . This product has accurate temperature control, dependability is high, the security is good, have too even to have sand holes and unique gluing plastic mould technology sealing properties, help users operate.
Main technical indicator
1.service condition: Above sea level not to exceed 1000 meters
Environmental humidity: -20 degrees Centigrade - 50 degrees Centigrade
Relative humidity: 45% -95%
Use the voltage: 176V-245VAC
Frequency of utilization: 50±1HZ
2.heat mould head temperature: 260±5℃
3.safe index: The insulating resistance is not smaller than 1MΩ¸
Leak the electric current: ≤5mA (exchange virtual value)
Operation method:
1, regular welding device:
Choose installation to be easy to heat end head, put at the regular support person who weld, install the corresponding heating mould very beginning according to the necessary pipe specification, and it is urgent to sprain with the tool, small general model's head, in the front hole, the big model's head is in the back end hole.
2.Set up an electric circuit and preheated:
Put through the power (notice there must be ground protection lines in the power) ,The green indicator lamp is on, treat the green indicator lamp to go out, when the red indicator lamp is on, show the welding device enters the state of controlling the temperature automatically, can begin to operate. Notice: Control the temperature state automatically and then, red green lantern fair is it light to hocket, prove welding device to be in controlled state, do not influence and operate.
3, weld pipes:
By cutting the in charge offing device and cutting and breaking pipes vertically, advance pipe and pipe fittings person who weld mould in the head, push form demand is it think conduct operate to stock without spin at the same time, take the pipe and pipe fittings off at the same time on the head immediately after reaching and heating time, straight line even to meddle in get necessary depth without spin rapidly, is it connect office form in the even flange to make.
Note: If operating the environment temperature and is lower than 5 degrees Centigrade, heating time should lengthen 50%.
The precautions:
1、 This product adopts the single-phase tertiary safe flat plug, user can't modify plug unilaterally, must is it have earth connection at the socket to insert plug in when using.
2、 In the course of using, the hand and flammables can touch cable and melt hot parts, so as not to meet accident.
3、 Layman dismantles copies of part of controlling the temperature of product, so as not to get an electric shock and security performance of instrument.
4、 If red, the green indicator lamp does not adjust changing for a long time, prove the instrument has already broken down, should quit work immediately, cut off the power.
5、 If out of order should send the regional agency or the manufacturer to maintain, users can't dismantle at will.
6、 When the welding device is dispatched from the factory temperature has already been adjusted well, the layman can't adjust at will, so as not to influence the normal service life of the welding device.
7.It was guaranteed free for three months from day when buys that this product buys by oneself ( Except mould head damage artificially) Lifetime maintenance.
|
||||||||||||||||||||||||||||||||||||||||||||||||||
文章来源:http://www.juchetrade.com/te_news_industry/2009-04-08/762.chtml |